Buy Lead
Validity Period : 10.06.2018 - 10.06.2019

Fibre optics cables production line to set up in Algeria

Fibre optics cables production line to set up in Algeria Algeria

  • 10.06.2018
  • Algeria
  • Buy Lead
  • Credit

Summary

Approximate equipment requirements (same approach as for fiber optics)
- 01 line of tinning
- 01 extruder for insulation
- 01 irradiation facility, the isolations are all reticulated
- 01 tandem for the cladding which must be also reticule
- 01 control laboratory

Details and Contact Information

Images

-

Keywords

Sectors

Other Leads